Co-IDB specializes in providing consulting, demolition and renovation services, and turnkey office design and construction in Ho Chi Minh City and Hanoi.
We offer careful and professional interior demolition, quick restoration to original condition, saving clients time and ensuring they receive their deposit back.
Most office buildings have strict regulations regarding premises restoration. Failure to meet these standards may result in businesses being denied certification or having to pay additional repair costs.
The dismantling process is not simply about moving furniture; it involves many steps such as removing partitions, drywall ceilings, electrical and plumbing systems, flooring, and repainting the premises. Without a specific plan, businesses can run into problems with deadlines and budget.
If the dismantling and restoration of the premises takes longer than stipulated in the lease agreement, the business may be fined or required to pay additional rent.
An unprofessional contractor can prolong the demolition process, affecting relocation plans and site handover. This can lead to additional costs for businesses to repair and renovate the site to meet requirements.
Office furniture such as desks, chairs, filing cabinets, and glass partitions can be easily damaged if not dismantled and transported properly. This increases replacement costs and impacts the layout of the new office.
Many businesses struggle to find reputable design and construction companies after returning their old premises. Without prior planning, the transition to a new office can be delayed, impacting business operations.
Many businesses struggle to find reputable design and construction companies after returning their old premises. Without prior planning, the transition to a new office can be delayed, impacting business operations.
Just one mistake can cost you extra time, money, and even result in not getting your deposit back. That’s why businesses need a professional partner to ensure everything is right from the start.
With experience and expertise in office interior design and construction, CO-IDB is committed to providing optimal construction solutions, helping businesses own a professional, comfortable, and integrated workspace.
CO-IDB has directly implemented demolition and restoration work at more than 60 major buildings in Ho Chi Minh City, including Bitexco, Saigon Centre, Diamond Plaza, Deutsches Haus, Landmark 81, ETown, Pearl Plaza, etc.
Your office furniture will be dismantled and transported safely using specialized packing materials. CO-IDB helps businesses save on replacement costs, especially for equipment such as air conditioners, projectors, and large screens.
From surveying and item breakdown to construction plan development and acceptance testing, CO-IDB always provides detailed price quotes from the outset, helping businesses control their budget and avoid unforeseen “hidden fees”.
We have extensive experience in identifying, forecasting, and promptly addressing construction risks, from materials and schedules to technical issues, ensuring that projects operate according to plan.
Our professional supervision and construction team is on duty 24/7, minimizing the time required for dismantling, painting, cleaning, and handover. CO-IDB also assists in preparing acceptance reports and completing confirmations with the management board, enabling businesses to terminate their lease agreements promptly.
Immediately after the payment is completed, CO-IDB can proceed with the consulting, design, and construction of your new office. This “one-touch” solution saves you time searching for a new partner, avoids disruptions to your relocation plans, and optimizes overall project costs.
Below is a complete list of all items that CO-IDB will handle upon handover of the premises to the building
Temporary structures such as ceilings, partitions, and raised floors will be demolished to restore the original site. The demolition will be carried out carefully and professionally to ensure safety and minimize impact on surrounding buildings.
Implement safe demolition procedures, minimize dust and noise, and ensure the site remains unaffected, preserving the building’s structural integrity. The items include:
After dismantling, CO-IDB assists businesses in professionally relocating or handling furniture and equipment. The relocation process is carried out carefully, ensuring that equipment is not damaged and that the building’s operations are not disrupted.
After dismantling and relocation, CO-IDB carries out the cleaning, sanitation, and restoration of the site to its original condition for handover to the investor. CO-IDB is committed to fully implementing all items in the dismantling and restoration service, helping businesses save time and effort and ensuring that commitments to the investor are met.
After demolition, CO-IDB commits to collecting and disposing of all construction waste (bricks, mortar, metal, glass, electrical wires, etc.) in accordance with legal regulations and building rules. We will sort the waste on-site, use specialized packaging to collect it neatly, and transport it to a legal disposal site. Recyclable materials will be processed in an environmentally friendly manner, ensuring no impact on sanitation or traffic in the area.
|
Building Name |
Ranking |
Address |
|
Diamond plaza |
A |
34 Le Duan Street, Ben Nghe Ward, District 1 |
|
German House |
A |
A33 Le Duan Street, Ben Nghe Ward, District 1 |
|
Saigon Centre 2 |
A |
67 Le Loi Street, Ben Nghe Ward, District 1 |
|
Vietcombank Tower |
A |
5 Me Linh Square, Ben Nghe Ward, District 1 |
|
Me Linh Point Tower |
A |
2 Ngo Duc Ke Street, Ben Nghe Ward, District 1 |
|
Bitexco Financial Tower |
A |
2 Hai Trieu Street, Ben Nghe Ward, District 1 |
|
Saigon Tower |
A |
29 Le Duan Street, Ben Nghe Ward, District 1 |
|
Friendship Tower |
A |
31 Le Duan Street, Ben Nghe Ward, District 1 |
|
Empress Tower |
A |
138-142 Hai Ba Trung Street, Da Kao Ward, District 1 |
|
Le Meridien Saigon |
A |
3C Ton Duc Thang Street, Ben Nghe Ward, District 1 |
|
Central Plaza |
A |
17 Le Duan Street, Ben Nghe Ward, District 1 |
|
SunWah Tower |
A |
115 Nguyen Hue Street, Ben Nghe Ward, District 1 |
|
President Place Tower |
A |
93 Nguyen Du Street, Ben Nghe Ward, District 1 |
|
AB Tower |
A |
76 Le Lai Street, Ben Nghe Ward, District 1 |
|
Rong Viet Tower |
B |
141 Nguyen Du Street, Ward 1, District 1 |
|
Saigon Trade Center |
B |
37 Ton Duc Thang Street, Ben Nghe Ward, District 1 |
|
Saigon Finance Center Building |
B |
9 Dinh Tien Hoang Street, Da Kao Ward, District 1 |
|
TNR Building |
B |
190 Nguyen Cong Tru |
|
Building Name |
Ranking |
Address |
|
CII Tower |
A |
152 Dien Bien Phu Street, Ward 25, Binh Thanh District |
|
V-IKON |
A |
131 Dien Bien Phu |
|
LANDMARK 81 |
A |
208 Nguyen Huu Canh |
|
194 GOLDEN |
B |
473 Dien Bien Phu |
|
PEARL PLAZA |
B |
561 Dien Bien Phu |
|
HIU BUILDING |
B |
215 Dien Bien Phu |
|
AP TOWER |
B |
518B Dien Bien Phu |
|
BLACKSMITH |
B |
92H-92G Nguyen Huu Canh, Ward 22 |
|
OPAL |
B |
90 Nguyen Huu Canh |
|
L’MAK LONG TOWER |
B |
103 Nguyen Cuu Van Street – Ward 17 |
|
SAIGON VIEW |
B |
117 Nguyen Cuu Van Street – Ward 17 |
|
CII Tower |
A |
152 Dien Bien Phu Street, Ward 25, Binh Thanh District |
|
Building Name |
Ranking |
Address |
|
Nam A Tower |
B+ |
201-203 Cach Mang Thang 8 Street, Ward 4, District 3 |
|
Terra Royal |
B |
278 Nam Ky Khoi Nghia Street, Ward 8, District 3 |
|
Lim Tower II |
A |
158 Vo Van Tan Street, Ward 6, District 3 |
|
Pearl 5 |
A |
5 Le Quy Don Street, Ward 6, District 3 |
|
Centec Tower |
A |
72-74 NTMK, P6, Q3 |
|
Building Name |
Ranking |
Address |
|
TOWN 1 |
B |
364 Cong Hoa Street, Ward 13, Tan Binh District |
|
TOWN 2 |
B |
364 Cong Hoa Street, Ward 13, Tan Binh District |
|
TOWN 6 |
B |
364 Cong Hoa Street, Ward 13, Tan Binh District |
|
TOWN 5 |
B |
364 Cong Hoa Street, Ward 13, Tan Binh District |
|
Park IX Building |
B |
08 Phan Dinh Giot Street, Ward 2, Tan Binh District |
|
Republic Plaza |
B |
18E Cong Hoa Street, Ward 4, Tan Binh District |
|
The Six8 Building |
B |
24-26 Phan Dinh Giot Street, Ward 2, Tan Binh District |
|
Park Royal Building |
B |
311 Nguyen Van Troi Street, Ward 1, Tan Binh District |
|
TTC Tower |
B |
253 Hoang Van Thu Street, Ward 2, Tan Binh District |
|
Art Mall |
B |
60A Truong Son Street, Ward 2, Tan Binh District |
|
Mitalab Tower |
B |
383B-385 Cong Hoa Street, Ward 13, Tan Binh District |
|
TOWN 3 |
B |
364 Cong Hoa Street, Ward 13, Tan Binh District |
|
CT PLAZA |
B |
60A Truong Son Street – Tan Binh District |
|
Building Name |
Ranking |
Address |
|
Centre Point Tower |
B |
106 Nguyen Van Troi Street, Ward 8, Phu Nhuan District |
|
Newtecons Tower |
B |
96 Phan Dang Luu Street, Ward 5, Phu Nhuan District |
|
3 Bees Tower |
B |
281 Nguyen Van Troi Street, Ward 10, Phu Nhuan District |
|
The Address 2 Building |
B |
89 Phan Dinh Phung Street, Ward 17, Phu Nhuan District |
|
SU17 Building |
B |
No. 5 Ho Bieu Chanh Street, Ward 12, Phu Nhuan District |
|
Betrimex Building |
B |
62 Tran Huy Lieu Street, Ward 12, Phu Nhuan District |
|
The Prince Residence |
B |
17-19 Nguyen Van Troi Street, Ward 12, Phu Nhuan District |
|
L’Mak Hong Ha |
B |
127 Hong Ha Street, Ward 9, Phu Nhuan District |
After demolition and site clearance are complete, many businesses struggle to find a design and construction company for their new office – having to work with multiple parties, wasting time, and potentially incurring additional costs. With CO-IDB’s comprehensive service, you only need one point of contact for complete consultation, design, and construction, ensuring consistency, cost savings, and on-time completion.
Our consulting and design solutions go beyond just interior layout; they also ensure harmony between functionality, aesthetics, and brand identity.
From the choice of brand colors and interior materials to the lighting design, everything is personalized to match the company’s spirit.
Co-IDB is committed to providing professional office construction solutions with a systematic process, ensuring quality, timely completion, and cost optimization for businesses.
Our consulting and design solutions go beyond just interior layout; they also ensure harmony between functionality, aesthetics, and brand identity.
“CO-IDB’s process is systematic because for every renovation project, we want our clients to be involved at every stage, providing feedback and timely adjustments to create the most satisfactory office with the least amount of time and revisions.”
The construction plan design includes steps for dismantling, relocating, and restoring the site.
Ensure workplace safety and environmental hygiene throughout the construction process.
Proceed with dismantling items such as ceilings, partitions, and raised floors.
Relocate and transport furniture and equipment out of the premises.
Collect and dispose of construction waste in accordance with legal regulations.
Ensure environmental hygiene throughout and after construction.
Repair and restore affected surfaces, ensuring the area is returned to its original condition.
Conduct inspections, acceptance testing , and handover of the site to the client.
Inspect all completed work to ensure it fully meets all technical requirements and standards.
Handing over the premises to the client ensures satisfaction and avoids future disputes.
Dismantling and restoration services play a crucial role in ensuring the site is returned to its original condition after the temporary structure is removed. Choosing a professional service provider that fully complies with legal regulations is essential to ensure the safety and sustainability of the project.
Contact Co-IDB for detailed consultation and solutions tailored to your project needs. We are committed to providing high-quality, safe, and compliant demolition and restoration solutions. Don’t hesitate to leave us a message or call us today to begin your journey towards building a better living and working environment.
Ho Chi Minh Office
Hanoi Office
Services
Quick Links
Copyright © 2025 Co-IDB, Inc. All rights reserved.